Renovation

Bathroom and laundry rough-ins

The plumbing behind a bathroom or laundry renovation, set out and certified so the waterproofer, tiler and cabinetmaker can work to it.

$2600 to $7400 2 to 5 days across two visits Southern Gold Coast

What it covers

Bathroom and laundry rough-ins

Price
$2600 to $7400
Length
2 to 5 days across two visits
Category
Renovation
Included
5 items

The rough-in is the part nobody sees and the part that decides whether the renovation works. We set out wastes, falls and stub-outs to the drawing, pressure test before the wall is closed, coordinate our timing with the waterproofer and the tiler, then come back for the fit-off once the surfaces are in. The work is done under a QBCC plumbing and drainage licence and the compliance paperwork is issued at the end.

Included in the price

  • Set-out walked through on site with you or the builder
  • Water, waste and vent rough-in
  • Floor waste and shower falls set before waterproofing
  • Return visit for tapware, toilet and vanity fit-off
  • Compliance paperwork issued on completion

On the day

How this one runs.

  1. 01 Walk the plan with you and mark the set-out
  2. 02 Rough in the water, waste and vent
  3. 03 Pressure test before the wall is closed
  4. 04 Stand aside for the waterproofer and tiler
  5. 05 Return for fit-off, commissioning and paperwork
Dane Hollis inspecting a kitchen mixer tap
A frame from the ad: bathroom and laundry rough-ins, on a real job.

What it costs

$2600 to $7400

A straight swap inside the same footprint sits at the low end. Moving a toilet or a floor waste, cutting a slab, or a second bathroom on the same job moves it up quickly.

Book a site visit

Asked every week

Asked about this job.

Can you move the toilet to the other wall?
Usually. On a slab it means cutting and re-laying the drain, which is the single biggest cost in a bathroom renovation, so we price it before you commit to the layout.
Do you work with our builder, or do we manage you directly?
Either way. Most of our renovation work is direct with the homeowner, and we coordinate our own timing with the waterproofer and the tiler.
Do we get compliance paperwork at the end?
Yes. Notifiable plumbing work gets a compliance form on completion, and it is a document you will want again at resale.

On this job

Reviews left for bathroom and laundry rough-ins.

  • Full bathroom rough-in. The set-out matched the drawing, they turned up when the tiler needed them to, and the compliance paperwork came through without me chasing it.

    Grant M., Reedy Creek

  • Solid work on the laundry. Would have liked a bit more warning that the water would be off for the afternoon, but they left the place spotless.

    Meg O., Broadbeach Waters

Next step

Book a site visit

Ring (07) 5550 0060 or send the form and we will confirm a time. Most standard jobs get a slot inside one to two business days.

Book a plumber

Also worth knowing

  • Every job quoted before we start, and the quote is what you pay unless you ask for more work
  • Twelve-month warranty on our workmanship, on top of the manufacturer warranty on parts
  • The same blockage inside ninety days is re-cleared at no charge
  • The call-out fee comes off the invoice when the work goes ahead
  • The area is left dry and wiped down, or the call-out is on us

Ask about bathroom and laundry rough-ins

Tell us what is going on and we will reply with a time and a rough price.

or call (07) 5550 0060

This is a demonstration form. Nothing is sent and nothing is stored.